admin

Pond cover

Pond cover

This little project was a first for me. In October of 2013, a long-time customer was looking for a way to keep the leaves out of his pond. After digging four footings 42″ deep we installed pressure treated 6×6 posts and concrete. Then built the roof structure on 16″ centers and installed a clear plastic […]

Read More →

Read More →

Wrought iron handrail

Wrought iron handrail

A handrail with wrought iron spindles installed for a long time customer in 2014.

Read More →

Read More →

First Floor and Kitchen Remodel

First Floor and Kitchen Remodel

This is a first floor/kitchen remodel completed in 2007. As far as transformations go, this was a fairly significant one which involved many scopes of the construction industry. We removed all interior walls including the load bearing center wall.Typically, you would be left with an exposed header supporting the second floor where the wall was […]

Read More →

Read More →

Top